{"id":2850,"date":"2021-03-03T15:38:00","date_gmt":"2021-03-03T14:38:00","guid":{"rendered":"https:\/\/www.obat.fr\/blog\/?p=2850"},"modified":"2024-05-14T16:15:37","modified_gmt":"2024-05-14T14:15:37","slug":"plan-installation-chantier","status":"publish","type":"post","link":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/","title":{"rendered":"Comment faire un plan d&rsquo;installation de chantier efficace ?"},"content":{"rendered":"\n<p>Le <strong>plan d&rsquo;installation de chantier, <\/strong>ou<strong> <\/strong>PIC,<strong> <\/strong>intervient dans le d\u00e9roulement des ouvrages de gros-oeuvre dans le b\u00e2timent. \u00c9tabli au commencement des travaux, ce document est indispensable \u00e0 la fois pour l\u2019obtention des <strong>autorisations obligatoires<\/strong> et pour l\u2019<strong>organisation du chantier<\/strong>. Qu\u2019est-ce qu\u2019un PIC b\u00e2timent et quel est son but ? Qui le r\u00e9dige ? Que contient-il ? Et <strong>comment faire un plan d\u2019installation de chantier<\/strong> efficace ? R\u00e9ponse dans cet article !&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u2019est-ce qu\u2019un plan d\u2019installation de chantier ?<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">D\u00e9finition du PIC<\/h3>\n\n\n\n<p>Le <strong>plan d\u2019installation de chantier <\/strong>regroupe toutes les donn\u00e9es concernant l&rsquo;organisation et la disposition des travaux de construction. C&rsquo;est un \u00e9l\u00e9ment indispensable \u00e0 la pr\u00e9paration et au bon d\u00e9roulement du chantier. Il est \u00e9tabli en amont de la construction, \u00e0 partir d\u2019un <a aria-label=\" (s\u2019ouvre dans un nouvel onglet)\" href=\"https:\/\/permis-de-construire.ooreka.fr\/fiche\/voir\/368917\/faire-un-plan-de-masse\" target=\"_blank\" rel=\"noreferrer noopener\">plan de masse<\/a>.<\/p>\n\n\n\n<p>Le PIC d\u00e9signe <strong>l\u2019emplacement<\/strong> de tous les <strong>\u00e9quipements<\/strong> et <strong>\u00e9l\u00e9ments fixes<\/strong> n\u00e9cessaires \u00e0 la r\u00e9alisation des travaux. Sont indiqu\u00e9s sur le PIC BTP :&nbsp;&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>les <a href=\"https:\/\/www.obat.fr\/blog\/engin-de-chantier\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"engins de chantier (s\u2019ouvre dans un nouvel onglet)\">engins de chantier<\/a> (grues, nacelles, chargeuses, bulldozer\u2026) ;<\/li>\n\n\n\n<li>le stockage des d\u00e9chets de chantier et bennes de collectes ;<\/li>\n\n\n\n<li>les zones pr\u00e9vues pour l\u2019entrep\u00f4t des mat\u00e9riaux ;<\/li>\n\n\n\n<li>les espaces communs d&rsquo;accueil et de repos des intervenants.<\/li>\n<\/ul>\n\n\n\n<p>\u00c0 noter que les informations figurant sur le plan d\u2019installation de chantier sont compl\u00e9t\u00e9es par la lecture du <a href=\"https:\/\/www.obat.fr\/blog\/ccap-travaux\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (s\u2019ouvre dans un nouvel onglet)\">CCAP<\/a> et du CCTP (cahier des clauses techniques particuli\u00e8res).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00c0 quoi sert-il ?<\/h3>\n\n\n\n<p>Le PIC est tout d\u2019abord utile d\u2019un <strong>point de vue l\u00e9gal<\/strong>, puisqu\u2019il sert \u00e0 obtenir les <strong>autorisations administratives<\/strong> en mati\u00e8re de s\u00e9curit\u00e9 et d\u2019hygi\u00e8ne de la part des mairies et des pr\u00e9fectures de police. Ces derni\u00e8res sont en effet <strong>obligatoires \u00e0 l\u2019implantation de l\u2019ouvrage<\/strong>, notamment pour installer des engins de chantier dans l\u2019espace public de mani\u00e8re s\u00e9curitaire.&nbsp;<br><\/p>\n\n\n\n<p>Mais le plan d\u2019installation de chantier joue aussi un r\u00f4le cl\u00e9 dans l\u2019<strong>organisation du chantier<\/strong> de construction. Il permet ainsi d\u2019<strong>optimiser l\u2019espace <\/strong>disponible<strong> <\/strong>au sein de ses diff\u00e9rentes zones et donc l\u2019<strong>agencement<\/strong> global du chantier. En veillant \u00e0 la bonne planification du chantier, le PIC maximise les op\u00e9rations des intervenants tout en minimisant les complications \u00e0 l\u2019origine des retards de livraisons et des surco\u00fbts.&nbsp;<br><\/p>\n\n\n\n<p>Enfin, le PIC est parfois inclus dans le <strong>dossier de candidature <\/strong>des entreprises lors de la phase d\u2019appel d\u2019offres. Dans ce cas, il va servir de document de r\u00e9f\u00e9rence dans l\u2019\u00e9tude de prix du projet et donc d\u2019argument commercial pour appuyer la proposition de l\u2019entrepreneur.&nbsp;<\/p>\n\n\n\n<p><em>\u00c0 lire : <\/em><a href=\"https:\/\/www.obat.fr\/blog\/appels-d-offres-batiment\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (s\u2019ouvre dans un nouvel onglet)\"><em>Comment trouver des appels d\u2019offres dans le BTP ?<\/em><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qui \u00e9tablit le plan d&rsquo;installation de chantier ?<\/h2>\n\n\n\n<p>C\u2019est l\u2019<strong>entrepreneur du BTP<\/strong> titulaire du march\u00e9 de gros-oeuvre qui r\u00e9dige le plan d&rsquo;installation de chantier. \u00c0 savoir que le donneur d\u2019ordre charg\u00e9 de la r\u00e9daction du PIC chantier est d\u00e9sign\u00e9 dans le <strong>dossier de consultation des entreprises <\/strong>(DCE).&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/exemple-plan-installation-de-chantier.png\" alt=\"exemple de plan d'installation de chantier\" class=\"wp-image-2852\" width=\"878\" height=\"629\" srcset=\"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/exemple-plan-installation-de-chantier.png 878w, https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/exemple-plan-installation-de-chantier-300x215.png 300w, https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/exemple-plan-installation-de-chantier-768x550.png 768w\" sizes=\"(max-width: 878px) 100vw, 878px\" \/><figcaption class=\"wp-element-caption\"><em>Exemple de plan d&rsquo;installation de chantier vu sur www.oeecentre.fr<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Que doit figurer sur le plan d\u2019installation de chantier ?<\/h2>\n\n\n\n<p>Le PIC sert donc \u00e0 <strong>pr\u00e9parer un chantier de b\u00e2timent<\/strong>. Concernant son contenu, il doit comporter le plus grand nombre d\u2019informations possibles sur l&rsquo;\u00e9tat naturel et technique du chantier et sur la disposition des \u00e9quipements. <\/p>\n\n\n\n<p>Voici ci-dessous <strong>les<\/strong> <strong>\u00e9l\u00e9ments principaux \u00e0 retrouver sur un plan d&rsquo;installation de chantier<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Le fond de plan&nbsp;<\/h3>\n\n\n\n<p>Le <strong>fond de plan <\/strong>constitue la base du PIC b\u00e2timent. Il se compose lui-m\u00eame de 2 types de plan :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>le <strong>plan topographique<\/strong> du terrain sur lequel est b\u00e2ti l\u2019ouvrage, autrement dit la visualisation des reliefs naturels, les altitudes, les points d\u2019eau\u2026&nbsp;<\/li>\n\n\n\n<li>le <strong>plan de masse<\/strong>, soit la repr\u00e9sentation graphique du projet de construction (les b\u00e2timents et les \u00e9l\u00e9ments \u00e0 construire).&nbsp;<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Les r\u00e9seaux&nbsp;<\/h3>\n\n\n\n<p>Le plan d\u2019installation de chantier doit mat\u00e9rialiser les <strong>r\u00e9seaux de distribution <\/strong>et<strong> de raccordement<\/strong> \u00e9nerg\u00e9tiques. Cela comprend les r\u00e9seaux d\u2019\u00e9lectricit\u00e9, des eaux us\u00e9es et d\u2019eau potable, de gaz, de t\u00e9l\u00e9phonie et internet. Ces donn\u00e9es se trouvent le plus souvent en mairie ou directement aupr\u00e8s du gestionnaire du r\u00e9seau concern\u00e9.&nbsp;<br><\/p>\n\n\n\n<p>Les identifier sur le plan va permettre en premier lieu d\u2019\u00e9viter de <strong>les<\/strong> <strong>endommager<\/strong> lors des travaux. C\u2019est aussi le moyen d\u2019\u00e9valuer s\u2019il est n\u00e9cessaire de demander des <strong>autorisations<\/strong> pr\u00e9alables aux distributeurs des r\u00e9seaux.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">La base de vie&nbsp;<\/h3>\n\n\n\n<p>La <strong>base de vie<\/strong> repr\u00e9sente l\u2019ensemble des lieux pr\u00e9vus pour <strong>recevoir les travailleurs<\/strong> qui vont intervenir sur le chantier. On pense ici aux sanitaires, aux bureaux, aux r\u00e9fectoire et aux vestiaires, ainsi que tout autre aire de travail utile \u00e0 la ma\u00eetrise d&rsquo;\u0153uvre. En g\u00e9n\u00e9ral, on place la base de vie \u00e0 <strong>proximit\u00e9 de l\u2019entr\u00e9e <\/strong>et en dehors du secteur de survol des engins de levage.&nbsp;<\/p>\n\n\n\n<p>\u00c0 savoir : pour \u00eatre conforme \u00e0 la r\u00e9glementation, la base doit r\u00e9pondre \u00e0 des caract\u00e9ristiques et dimensions pr\u00e9cises. On compte ainsi 1.25m2\/personne pour les r\u00e9fectoires et vestiaires, un lavabo pour 10 usagers et un urinoir\/cabinet pour 20. Les couloirs de d\u00e9placement entre les abris doivent \u00eatre couverts pour prot\u00e9ger les travailleurs contre les intemp\u00e9ries.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les aires de stockage&nbsp;<\/h3>\n\n\n\n<p>Il est \u00e9galement primordial d\u2019indiquer sur le plan d\u2019installation de chantier les zones de <strong>stockage du mat\u00e9riel <\/strong>et<strong> des mat\u00e9riaux.<\/strong> Ceci est un bon moyen de s\u2019assurer qu\u2019ils respectent les distances de s\u00e9curit\u00e9 et ne g\u00eanent pas les flux de circulation.&nbsp;<br><\/p>\n\n\n\n<p>Pour chaque \u00e9l\u00e9ment, il convient de pr\u00e9ciser sa nature et la surface utilis\u00e9e. Il faut aussi faire figurer les postes de pr\u00e9fabrication et de ferraillage et l\u2019emplacement de la centrale \u00e0 b\u00e9ton, des bennes \u00e0 gravats et des panneaux de signalisation.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les moyens de levage<\/h3>\n\n\n\n<p>L\u2019emplacement des diff\u00e9rents <strong>engins de levage<\/strong> (grues, chariots \u00e9l\u00e9vateurs, monte charge\u2026) utilis\u00e9s pour la construction doit \u00eatre clairement repr\u00e9sent\u00e9.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les cl\u00f4tures<\/h3>\n\n\n\n<p>Tous les types de <strong>panneaux<\/strong>, <strong>palissades<\/strong> et autres <strong>cl\u00f4tures grillag\u00e9es<\/strong> et <strong>bacs aciers<\/strong> d\u00e9limitant l\u2019ouvrage doivent figurer sur le PIC BTP.&nbsp; Il convient de noter leur hauteur et leurs dimensions, ainsi que les <strong>points d\u2019acc\u00e8s <\/strong>pour entrer et sortir du chantier (portail, portillon\u2026)<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les flux de circulation<\/h3>\n\n\n\n<p>Le PIC chantier doit indiquer les<strong> flux de circulation pi\u00e9tonne<\/strong> \u00e0 mettre en place d\u2019un lieu jusqu\u2019\u00e0 un autre, par exemple de la base de vie \u00e0 la zone de travail. Pour la s\u00e9curit\u00e9 des ouvriers, ces cheminements doivent \u00eatre am\u00e9nag\u00e9s et s\u00e9curis\u00e9s contre les chutes de plain-pied et les interactions avec des engins.&nbsp;<br><\/p>\n\n\n\n<p>Parall\u00e8lement, il faut aussi faire appara\u00eetre la <strong>circulation des v\u00e9hicules de chantier <\/strong>(en respect du code de la route), les zones de <strong>stationnement<\/strong> et les points d\u2019<strong>\u00e9vacuation<\/strong>. L\u2019installation de feux tricolores et de passages pi\u00e9tons peuvent \u00eatre n\u00e9cessaires afin de contr\u00f4ler l\u2019entrecroisement des flux.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">La gestion environnementale&nbsp;<\/h3>\n\n\n\n<p>Le d\u00e9veloppement durable et la <strong>gestion environnementale<\/strong> sont des enjeux de plus en plus importants sur les chantiers du b\u00e2timent. C\u2019est pourquoi l\u2019ensemble des moyens mis en place dans cette optique doivent appara\u00eetre sur le plan d\u2019installation de chantier. On entend ici les zones de<strong> tri des d\u00e9chets<\/strong>, les espaces de stockage des <strong>mat\u00e9riaux polluant<\/strong>s et le <strong>traitement des eaux us\u00e9es<\/strong>.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Coupes et \u00e9l\u00e9vation g\u00e9n\u00e9rale<\/h3>\n\n\n\n<p>Enfin, le PIC doit mentionner <strong>l\u2019altitude<\/strong> et la <strong>hauteur<\/strong> des diverses installations de l\u2019ouvrage, qu\u2019il s\u2019agisse des b\u00e2timents et des fa\u00e7ades, des grues, de la b\u00e9tonni\u00e8re ou encore des arbres. Il doit montrer le plus de coupes possibles, autrement dit de vue verticale des \u00e9l\u00e9ments.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment r\u00e9aliser un plan d&rsquo;installation de chantier ?<\/h2>\n\n\n\n<p>Dessiner le<strong> plan d\u2019installation de chantier<\/strong> n\u00e9cessite l\u2019utilisation d\u2019un logiciel sp\u00e9cialis\u00e9. Si certains logiciels de suivi de chantier incluent cette fonctionnalit\u00e9, le mieux est de passer par un <strong>outil de dessin industriel<\/strong>. Une fois finalis\u00e9, il est recommand\u00e9 de faire imprimer le PIC en grand format pour faciliter la lisibilit\u00e9.&nbsp;<\/p>\n\n\n\n<p>Voici un <a rel=\"noreferrer noopener\" aria-label=\"exemple de plan d'installation de chantier  (s\u2019ouvre dans un nouvel onglet)\" href=\"https:\/\/drive.google.com\/file\/d\/0B7AtAharpg7MamJaaHZBY3F1LVE\/view\" target=\"_blank\">exemple de plan d&rsquo;installation de chantier<\/a> en pdf mis \u00e0 disposition par le site 4geniecivil.<\/p>\n\n\n\n<p>Vous pouvez aussi faire un plan d\u2019installation de chantier avec un <strong>logiciel BIM<\/strong>. Cet outil permettra la repr\u00e9sentation du plan \u00e0 travers une <strong>maquette 3D <\/strong>tr\u00e8s r\u00e9aliste et pr\u00e9cise. Avec le BIM, la collaboration avec les autres intervenants est en outre simplifi\u00e9e.&nbsp;<\/p>\n\n\n\n<p>Pour savoir quels sont les meilleurs outils BIM du moment, consultez notre article sur les <a href=\"https:\/\/www.obat.fr\/blog\/meilleurs-logiciels-bim\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (s\u2019ouvre dans un nouvel onglet)\">10 meilleurs logiciels BIM, gratuits et payants en 2021<\/a>.&nbsp;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<p>Vous comprenez maintenant mieux l\u2019utilit\u00e9 du <strong>PIC b\u00e2timent. <\/strong>Savoir<strong> <\/strong>comment r\u00e9aliser un <strong>plan d\u2019installation de chantier<\/strong> efficace est essentiel en tant qu\u2019entrepreneur BTP. Celui-ci est non seulement n\u00e9cessaire pour obtenir les <strong>autorisations de construction<\/strong>, mais aussi dans l\u2019<strong>organisation du chantier<\/strong> en lui-m\u00eame. Il sert \u00e0 la fois \u00e0 d\u00e9terminer les besoins des prestataires, les moyens \u00e0 mettre en place et \u00e0 pr\u00e9venir les risques relatifs aux conditions de travail des ouvriers. Ce document doit \u00eatre le plus pr\u00e9cis possible et contenir diverses informations concernant l\u2019emplacement des \u00e9quipements et des \u00e9l\u00e9ments fixes.&nbsp;<br><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom kksr-disabled\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;2850&quot;,&quot;readonly&quot;:&quot;1&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;1&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Notez cet article&quot;,&quot;legend&quot;:&quot;5\\\/5 - (1 vote)&quot;,&quot;size&quot;:&quot;16&quot;,&quot;title&quot;:&quot;Comment faire un plan d\\u0026#039;installation de chantier efficace ?&quot;,&quot;width&quot;:&quot;102.5&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 102.5px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 16px; height: 16px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 12.8px;\">\n            5\/5 - (1 vote)    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Le plan d&rsquo;installation de chantier, ou PIC, intervient dans le d\u00e9roulement des ouvrages de gros-oeuvre dans le b\u00e2timent. \u00c9tabli au commencement des travaux, ce document est indispensable \u00e0 la fois pour l\u2019obtention des autorisations obligatoires et pour l\u2019organisation du chantier. Qu\u2019est-ce qu\u2019un PIC b\u00e2timent et quel est son but ? Qui le r\u00e9dige ? Que [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":2851,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[14,3],"tags":[],"class_list":["post-2850","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-definition-btp","category-gestion-entreprise"],"acf":{"adam_posts_cta_bloc":{"adam_cb_image":null,"adam_cb_titre":"Trouvez des chantiers en sous traitance pr\u00e8s de chez vous.","adam_cb_cta":null},"hide_the_universal_cta":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comment faire un plan d&#039;installation de chantier efficace ?<\/title>\n<meta name=\"description\" content=\"Qu&#039;est-ce qu&#039;un plan d&#039;installation de chantier et pourquoi est-il indispensable \u00e0 l&#039;organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comment faire un plan d&#039;installation de chantier efficace ?\" \/>\n<meta property=\"og:description\" content=\"Qu&#039;est-ce qu&#039;un plan d&#039;installation de chantier et pourquoi est-il indispensable \u00e0 l&#039;organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog Obat\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-03T14:38:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-14T14:15:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Laurie Liagre\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Laurie Liagre\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/\"},\"author\":{\"name\":\"Laurie Liagre\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/#\\\/schema\\\/person\\\/ca9318cc3f120c3482ef7bbeb870ab5b\"},\"headline\":\"Comment faire un plan d&rsquo;installation de chantier efficace ?\",\"datePublished\":\"2021-03-03T14:38:00+00:00\",\"dateModified\":\"2024-05-14T14:15:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/\"},\"wordCount\":1601,\"image\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/plan-installation-chantier.jpg\",\"articleSection\":[\"D\u00e9finition BTP\",\"Gestion d'entreprise\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/\",\"url\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/\",\"name\":\"Comment faire un plan d'installation de chantier efficace ?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/plan-installation-chantier.jpg\",\"datePublished\":\"2021-03-03T14:38:00+00:00\",\"dateModified\":\"2024-05-14T14:15:37+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/#\\\/schema\\\/person\\\/ca9318cc3f120c3482ef7bbeb870ab5b\"},\"description\":\"Qu'est-ce qu'un plan d'installation de chantier et pourquoi est-il indispensable \u00e0 l'organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/plan-installation-chantier.jpg\",\"contentUrl\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/02\\\/plan-installation-chantier.jpg\",\"width\":730,\"height\":365,\"caption\":\"plan d'installation de chantier\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/plan-installation-chantier\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gestion d'entreprise\",\"item\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/gestion-entreprise\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Comment faire un plan d&rsquo;installation de chantier efficace ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/\",\"name\":\"Blog Obat\",\"description\":\"Blog Obat\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/#\\\/schema\\\/person\\\/ca9318cc3f120c3482ef7bbeb870ab5b\",\"name\":\"Laurie Liagre\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g\",\"caption\":\"Laurie Liagre\"},\"description\":\"Responsable \u00e9ditoriale et r\u00e9dactrice web chez Obat depuis 2019, j'aide les artisans du b\u00e2timent \u00e0 naviguer dans le monde complexe de la gestion d'entreprise au travers de contenus complets, pertinents et bien document\u00e9es.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/laurie-liagre-9b8271b2\\\/\"],\"url\":\"https:\\\/\\\/www.obat.fr\\\/blog\\\/author\\\/laurie\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comment faire un plan d'installation de chantier efficace ?","description":"Qu'est-ce qu'un plan d'installation de chantier et pourquoi est-il indispensable \u00e0 l'organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/","og_locale":"fr_FR","og_type":"article","og_title":"Comment faire un plan d'installation de chantier efficace ?","og_description":"Qu'est-ce qu'un plan d'installation de chantier et pourquoi est-il indispensable \u00e0 l'organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.","og_url":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/","og_site_name":"Blog Obat","article_published_time":"2021-03-03T14:38:00+00:00","article_modified_time":"2024-05-14T14:15:37+00:00","og_image":[{"width":730,"height":365,"url":"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg","type":"image\/jpeg"}],"author":"Laurie Liagre","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Laurie Liagre","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#article","isPartOf":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/"},"author":{"name":"Laurie Liagre","@id":"https:\/\/www.obat.fr\/blog\/#\/schema\/person\/ca9318cc3f120c3482ef7bbeb870ab5b"},"headline":"Comment faire un plan d&rsquo;installation de chantier efficace ?","datePublished":"2021-03-03T14:38:00+00:00","dateModified":"2024-05-14T14:15:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/"},"wordCount":1601,"image":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#primaryimage"},"thumbnailUrl":"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg","articleSection":["D\u00e9finition BTP","Gestion d'entreprise"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/","url":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/","name":"Comment faire un plan d'installation de chantier efficace ?","isPartOf":{"@id":"https:\/\/www.obat.fr\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#primaryimage"},"image":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#primaryimage"},"thumbnailUrl":"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg","datePublished":"2021-03-03T14:38:00+00:00","dateModified":"2024-05-14T14:15:37+00:00","author":{"@id":"https:\/\/www.obat.fr\/blog\/#\/schema\/person\/ca9318cc3f120c3482ef7bbeb870ab5b"},"description":"Qu'est-ce qu'un plan d'installation de chantier et pourquoi est-il indispensable \u00e0 l'organisation et \u00e0 la pr\u00e9paration des chantiers du BTP ? R\u00e9ponse ici.","breadcrumb":{"@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#primaryimage","url":"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg","contentUrl":"https:\/\/www.obat.fr\/blog\/wp-content\/uploads\/2021\/02\/plan-installation-chantier.jpg","width":730,"height":365,"caption":"plan d'installation de chantier"},{"@type":"BreadcrumbList","@id":"https:\/\/www.obat.fr\/blog\/plan-installation-chantier\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.obat.fr\/blog\/"},{"@type":"ListItem","position":2,"name":"Gestion d'entreprise","item":"https:\/\/www.obat.fr\/blog\/gestion-entreprise\/"},{"@type":"ListItem","position":3,"name":"Comment faire un plan d&rsquo;installation de chantier efficace ?"}]},{"@type":"WebSite","@id":"https:\/\/www.obat.fr\/blog\/#website","url":"https:\/\/www.obat.fr\/blog\/","name":"Blog Obat","description":"Blog Obat","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.obat.fr\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/www.obat.fr\/blog\/#\/schema\/person\/ca9318cc3f120c3482ef7bbeb870ab5b","name":"Laurie Liagre","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/650b2f731153cbb94f7b640ed4e31c395bcc3da306c4162778890be749a57bb6?s=96&d=blank&r=g","caption":"Laurie Liagre"},"description":"Responsable \u00e9ditoriale et r\u00e9dactrice web chez Obat depuis 2019, j'aide les artisans du b\u00e2timent \u00e0 naviguer dans le monde complexe de la gestion d'entreprise au travers de contenus complets, pertinents et bien document\u00e9es.","sameAs":["https:\/\/www.linkedin.com\/in\/laurie-liagre-9b8271b2\/"],"url":"https:\/\/www.obat.fr\/blog\/author\/laurie\/"}]}},"_links":{"self":[{"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/posts\/2850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/comments?post=2850"}],"version-history":[{"count":0,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/posts\/2850\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/media\/2851"}],"wp:attachment":[{"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/media?parent=2850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/categories?post=2850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.obat.fr\/blog\/wp-json\/wp\/v2\/tags?post=2850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}